An extruder explosion and fire at the Röchling Engineering Plastics facility in Orangeville, Ontario, Canada, in late December caused an estimated CAD$750,000 ($594,000) in damage.
A blast occurred December 30 at the facility and one worker suffered an injury and ended up rushed to an area hospital.
“The worker suffered burns from the incident,” said Kaleem McSween, spokesperson for the Ontario Ministry of Labour, Training and Skills Development (MLTSD), in an Orangeville Banner report. “The Ministry of Labour, Training and Skills Development does not provide the status of a worker’s injuries.”
Two orders and a requirement were issued to the plastics building. About 20 Orangeville firefighters were at the scene of the Dec. 30 incident. They received assistance from Caledon, Shelburne and Grand Valley. “They assisted with their trucks and manpower,” said Fire Chief Ron Morden, adding this wasn’t the department’s first call to the facility.
“We respond to numerous industrial calls throughout a year, for different reasons. We’ve been there before, for other calls, but this one was a little bit more significant.”
Röchling Engineering Plastics manufactures UHMW-PE, HDPE, PP, nylon, Acetal and other materials.

