Terracon Consultants Inc. of Olathe, Kansas, is facing a $45,000 fine for five violations of Nuclear Regulatory Commission (NRC) requirements involving the loss of control of a portable nuclear gauge.
The NRC violations include a failure:
- By Terracon to control and maintain constant surveillance of licensed material.
- To use an approved container for the transport of licensed material.
- To lock or place the gauge inside a container to prevent unauthorized or accidental removal.
- To properly block and brace the canister from movement during transportation.
- To provide required notification to the NRC immediately following discovery of its loss, as described in an April 1 inspection report.
NRC staff met virtually with company representatives on May 20 during a pre-decisional enforcement conference to discuss the violations, which stem from a Nov. 25, 2019, incident in which a worker placed an unsecured portable nuclear gauge in the bed of a truck and drove away from a temporary job site in Killingly, Connecticut, and lost the gauge.
The gauge was subsequently recovered, but the technician did not provide complete and accurate information regarding the circumstances of the event during interviews with company officials.
