A crane offloading cargo struggled with the weight of a load being lifted from a supply vessel. When that happens, in some cases, the crane would just deposit the load back on the vessel, but the problem was once the cargo was lifted, the vessel pulled away, leaving the operator no option but to complete the lift and set the basket down on the platform deck.
The crane was shut down.
Upon inspection, investigators found the wire rope was damaged in two spots. In addition, the manifest listed the load weight of 4,300 pounds, but the load was actually 8,500 pounds, according to a report with the Bureau of Safety and Environmental Enforcement (BSEE).
On top of that, the load chart showed the crane was rated for 6,650 pounds at any angle.
Further investigation found the dock had mistakenly labeled the load as 4,300 pounds due to miscommunication over an intercom. Additionally, the basket weight tag was not changed and included the weight for an empty basket.
Therefore, BSEE recommended in a safety alert operators and contractors consider the following:
- Audit the logistics and coordination of shipments and loading from the shore base.
- Request and review cargo manifests to the affected offshore facility prior to shipment, showing both the loads and their weights (if over 5,000 pounds). Communicate this information to the crane operator so he/she may prepare for the lift(s).
- Verify loads exceeding 5,000 pounds are clearly marked on both the load and the cargo manifest before placing the load on the boat.
- Consider color and shape marking labels of certain weights, and where possible, ensure the markings are visible from the crane.
- Verify an assessment of the condition of the slings and rigging is included in pre-use/pre-lift inspections, since loads of equipment that are pre-slung from rental companies are not always checked by the transport company dock crew or boat crew.
- Check the load weight indicator to verify the load does not exceed the crane’s recommended load weight and ensure the basket weight tag reflects the weight of a loaded basket.
- Cranes that have exceeded their rated capacity should be removed from service, inspected, and tested by certified crane mechanics to verify the crane was not damaged.