While there were no abnormal occurrences (AO) in 2020 in the industrial sector when it came to radioactive material, there were four events that did not meet the (AO) criteria, but received significant attention from the Nuclear Regulatory Commission (NRC).

Details of the incidents appeared in a report by the NRC in its annual report to Congress.

In one incident On June 23, 2020, NRC received notification describing a potential worker overexposure occurring on October 22, 2019, at Spectratek, Services (licensee). This licensee manufactures and distributes tracer materials used in well logging operations. The exposure occurred when a welded container containing approximately 40.11 GBq (1,080 mCi) of iridium (Ir)-192 ceramic beads was improperly opened. On October 22, 2019, the licensee’s Radiation Safety Officer (RSO) sent the individual into the facility’s hot room to retrieve a quantity of iridium ceramic beads from a sealed container for shipment to a customer.

Under normal conditions, these containers end up opened in a sealed glove box inside the hot room using manipulator arms, but at the time of the event the manipulator arms failed to function as intended. The individual attempted to open the container outside of the glove box. The individual hand drilled into the top of the container to open and relieve the internal pressure. When the container’s wall was breached, some of the contents sprayed onto the individual’s upper torso, face, and eyes.

Radioactive Material Inhaled
Approximately 1000 mCi activity of radioactive material was recovered from the container. Approximately 2 mCi activity was collected during decontamination of areas outside the hot room, indicating that approximately 78 mCi activity released inside the hot room and was not recovered. For estimating the individual’s internal radiation dose, the licensee assumed the individual had ingested or inhaled the entire 78 mCi unrecovered quantity and estimated the individual had received a whole-body dose of approximately 6.5 mSv (650 mrem). The licensee did not conduct any bioassay measurements on the individual. The licensee also did not report the event since the individual’s estimated dose was below the regulatory threshold for reporting.

Schneider Bold

On May 23, 2020, the individual became ill and was transported to a local hospital where the family informed the physician that he may have been “radiation poisoned” months earlier.

In another incident, on June 30 last year in Alvin, Texas, INEOS Oligomers Chocolate Bayou Works reported a gauge failure that resulted in the unintended exposure of seven individuals, three of whom were classified as radiation workers.

The gauge’s rotary element and source tube separated from the gauge body as a result of what appeared to have been a significant force of yet unknown origin being applied to the rotary element. Upon discovery, workers attempted to reinstall two loose pieces, later identified as the 3.5 GBq (95 mCi) Cs-137 source and the source cover plate. Initially, six of the seven individuals were believed to have received radiation exposure that potentially exceeded regulatory limits. It was determined three of the workers handled the source and one of these three placed the source in his shirt pocket for an estimated 34 minutes.

In order to assess the exposure received by these workers, a physician monitored the affected workers. No adverse health effects were observed in any of the individuals.

The NRC performed dose modeling using an Electric Power Research Institute (EPRI) effective dose equivalent (EDE) calculation program developed for exposure to hot particles and a computer code designed to estimate dose to the skin from a hot particle (VARSKIN 6.2.1). Using these methods, the NRC calculated the EDE (whole‐body) dose for the maximally exposed individual was 4.9 mSv (490 mrem), and the calculated aggregate skin dose was 0.29 Sv (29 rem), both values below abnormal occurrence thresholds.

Stuck Source Guide Tube
In third incident, on August 3 last year in Mugla, Alabama, Applied Technical Services, Inc. reported a stuck source event, and resulted in an exposure above the regulatory annual limit to an individual involved in the source recovery. The licensee reported while using a 4.1 terabecquerel (TBq) (111 Ci) Ir-192 radiography source at an asphalt plant, a magnetic stand broke free from the side of a tank and crushed part of the radiography source guide tube.

Multiple efforts by the radiographer to return the source into the shield housing were unsuccessful. The radiographer contacted the RSO, who instructed the radiographer and his two assistants to move their whole-body dosimeters to their wrists to get an accurate extremity exposure reading. Additional shielding was also used by the radiographer and the assistants to reduce the radiation exposure to allow them to get closer to the crushed guide tube and exposed source. The radiographer attempted to return the crushed guide tube to a rounded shape with pliers and a hammer but was unsuccessful. The guide tube was then cut, which freed up enough space to allow the source to be successfully retracted.

All radiography personnel working at the asphalt plant were badged and no un-badged personnel received any exposure during the event.

The dosimeters worn by the radiography workers involved in the event were immediately sent off for processing. One individual received a dose to the extremities of 635.8 mSv (63.58 rem), which is over the allowable annual limit of 500 mSv (50 rem) for radiation workers. The other two employees received assigned extremity doses of 104.4 mSv (10.44 rem) and 26.1 mSv (2.61 rem), respectively. These three employees were removed from radiography operations for the remainder of the calendar year. Additionally, the licensee returned the radiography exposure device back to the manufacturer for investigation.

Offsite Power Outage
A fourth incident occurred August 10 last year in Palo, Iowa, when NextEra Energy reported an unusual event and unit trip due to the loss of offsite power (LOOP) on August 10 at the Duane Arnold Energy Center.

Extremely severe thunderstorms with heavy rain and high winds damaged all offsite power sources resulting in a reactor protective system automatic shutdown or trip. An automatic reactor shutdown is expected for a LOOP event. Reactor inventory control was maintained by reactor core isolation cooling and the safety relief valves were used to remove decay heat. Operators restored offsite power to the safety-related buses approximately 25 hours after the LOOP occurred and brought the plant to cold shutdown conditions on August 11.

The NRC performed an Accident Sequence Precursor analysis that resulted in a mean conditional core damage probability of 8×10-4, which is below the abnormal occurrence threshold of 1×10-3. Throughout the review of this event, the analysis assumptions and results were systematically reviewed to identify necessary standardized plant analysis risk model changes to realistically represent the event and expected plant response. The high winds experienced were not a beyond design basis event. The systems and components responded as designed and the overall peak wind speeds were within limits of a design basis tornado.

Duane Arnold Energy Center was planning to permanently shut down in October 2020; however, storm damage to the non-safety related structures resulted in the plant permanently shutting down after the event. The plant is currently undergoing decommissioning activities.